COMPANY FACILITIES | Disaster Preparedness |
---|---|
What is Primary Muster Point at the front of Eco's Driveway
In which area do Eco Personnel initially assemble during an emergency?
|
Who is Linda Sammy
This person is responsible for transporting the most recent back up files out of the office
|
What are fire extinguishers and panic buttons
There are 9 of each of these located throughout the building
|
What is a Hurricane Watch
This notification is issued 48 hours prior to the onset of a hazard.
|
What is Emergency Contact Information
This information is listed at the back of the sign in Register and stored on the Emergency Mobile Phone
|
What is the Damage Assessment Team
This team assesses the building following a disaster to determine whether it is safe to re-enter
|
Who are Incident Commanders
They are responsible for bringing a Level 1 Emergency under Control
|
What is an Earthquake
Associate the natural disaster to this procedure..."No person is to run out of the building or use the staircase"
|
What is 4 components
The building is equipped with how many components to detect and/or contain fire
|
What is turn off all breakers
What is the last item to be implemented before closing the office in preparation for a Hurricane?
|