Company Facilities | Disaster Preparedness |
---|---|
In which area do Eco Personnel initially assemble in during an emergency.
Muster Point at the Front of the Building
|
This person is responsible for transporting the most recent backup files out of the office
Linda Sammy
|
There are 7 of these located throughout the building
Panic Buttons
|
This alarm is typically issued 48 hours prior to the onset of the hazard
Hurricane Watch
|
This information is listed at the back of the sign in register and on the emergency mobile phone
Emergency contact information
|
This team (or member of the team) assesses the building following a natural disaster to determine whether it is safe to re-enter
Damage Assessment Team
|
They are responsible for bringing a Level 1 Emergency under control
Incident Commanders
|
What is the associated hazard to this procedure "No person is to run out of the building or use staircases"
Earthquake
|
The building is equipped with how many components to detect and/or contain/control fires
4
|
How many items are required to prepare the office in the event of a Hurricane Watch
6
|