Fall Protection Operation/Traversing/Loading Overhead Protection Stability in the Work-Zone General
100
What is access gates or openings
These must always be closed prior to the start of the lift
100
What are load capacity limits
Do not exceed ________ When considering number of employees and materials that will be used in the lift
100
What is Clearance!
Always be sure of ample overhead ______ when operating an aerial man-lift
100
What are outriggers
Always ensure these are set on pads or on a level, solid surface.
100
What is prior to each work shift?
A pre-start inspection is required this often
200
What is the floor of the lift platform
Always stand firmly here when operating an aerial man-lift
200
What is the combined weight of the workers, tools, and materials
Always take ________ into consideration when calculating the load
200
What are hazards (power-lines, for example)
Do not position aerial lifts between overhead ______ when possible
200
What are brakes
Always set these when outriggers are used
200
What is (any hazard): falling from the platform, electric lines, drop-offs, unstable surfaces, debris or floor obstructions, etc.
This is one example of a hazard associated with aerial man-lifts
300
What is guard rails or handrails
Do not climb or lean over these when working from the lift
300
What is fall protection
Unless this is immediately available, do not use a lift to access an upper landing
300
What is 10
Always make sure that lifts are _____ feet away from overhead power-lines
300
What are wheel chocks
Always use these when parked on, or working from a sloped surface
300
What is to keep from getting thrown out of the platform, or falling out of the platform
This is why it is important to remain 100% tied while working from an aerial man-lift
400
What is a Rescue Plan
Always make sure this plan is in place when working from an aerial man-lift (fall protection...)
400
What is False
True/False: It is okay to use an aerial man-lift as a crane
400
What is shut down (de-energized) or insulated.
Powerlines need to be either ____ or _____ for work closer than 10 ft.
400
What are cones, caution tape, warning worker above signs, ground level safety monitor, etc.
When working in an area with pedestrians, use these to reduce the likely-hood of someone walking beneath the lift.
400
What is familiarization
The first step to working with aerial man-lifts is the _____ process
500
What are adjacent structures or poles
Do not belt off to these while working from the platform
500
What are lower level controls
Do not operate ______ unless permission is obtained from the workers in the lift platform
500
What is a hard hat
When working below someone, or a hazard above, it is a good idea to wear this when working in an aerial man-lift
500
What is Housekeeping
Picking up trash, clearing debris, organizing tools, materials and equipment are all examples of this
500
What is trained and authorized
Only ___________ and ___________ employer designated personnel may operate man-lifts






Aerial Man-Lift Jeopardy

Press F11 for full screen mode



Limited time offer: Membership 25% off


Clone | Edit | Download / Play Offline